摘要
国家电网公司750kV输变电示范工程是我国第一个750kV电压等级的输变电工程,该工程的建设对西北电网750kV网架和国家百万伏级特高压电网的发展具有重要意义。文章介绍了该工程系统调试的概况,主要包括:系统调试的组织管理,系统调试工作大纲和调试方案,高新技术及新试验设备在试验调试中的应用,系统调试的试验项目和结果以及对该工程主要设备的评价。
The 750kV transmission pilot project of State Grid Corporation of China is the first 750kV transmission project in China. It is of great significance for the development of both Northwest 750kV bulk grid and domestic UHVAC (1000kV) grid to construct this pilot project. The general situation of system commissioning of the project, such as testing organization and management, outline of system commissioning and its test programme, new technology and test devices applied in the commissioning, items and results...
出处
《电网技术》
EI
CSCD
北大核心
2005年第20期5-13,共9页
Power System Technology
关键词
750kV输变电示范工程
超高压输电
系统调试
电力系统
750kV transmission and transformation pilot project
Eltra high voltage transmission
System commissioning
Power system