介绍了在保留桥梁的条件下 ,采用控制爆破技术拆除连体排架涵闸的成功经验。施工中采用定向爆破拆除与桥墩相连的单排立柱启闸房 ,采用多种爆破技术拆除其基础、八字墙护墩和过水底板。其技术措施和施工方法 。
Using controlled blasting, the conjoined row framework culvert sluice was successfully demolished while retaining the bridge. During the blasting operation, the single row column sluice gate room which used to be connected to piers was demolished through directional blasting. The foundation, splayed protective piers and the water passing gate floor were demolished using various blasting technologies. The technologies and engineering methods would serve as references for similar operations.
出处
《矿业研究与开发》
CAS
2001年第S1期33-35,38,共4页
Mining Research and Development
关键词
桥墩连体立柱
涵闸
定向爆破
Piers conjoined column
Culvert sluice
Directional blasting