摘要
介绍了城市轨道交通区间竖井施工穿越沙层段时遇到涌水流砂时的治理方案,总结了综合治理的方法和经验,为今后竖井施工提供了宝贵经验。
It is introduced in this paper the treatment scheme for vertical shaft meeting water burst and running sand when it crosses the sand section,in the city subway construction.Comprehensive treating methods and experience are summarized,which can reference to future vertical shaft construction.
出处
《铁道建筑技术》
2009年第3期48-50,共3页
Railway Construction Technology
关键词
城市地铁
竖井
涌水流砂
监控量测
沉降控制
city subway
vertical shaft
water burst and running sand
monitor and measure
settlement control