期刊文献+

大跨劲性骨架拱桥外包混凝土浇注方案 被引量:26

Outsourcing Concrete Pouring Scheme of Long-Span Stiff Skeleton Arch Bridge
下载PDF
导出
摘要 以在建昭化嘉陵江大跨劲性骨架拱桥为研究对象,采用Midas Civil 2010建立拱箱的梁-板组合有限元模型,对该桥的外包混凝土施工过程进行计算,探讨不同的浇注方案对劲性骨架拱桥的受力及挠度的影响,并考虑施工过程中的稳定性,为同类型桥梁施工提供参考和借鉴。 Taking Zhaohua Jialing river long-span stiff skeleton concrete arch bridge in construction as the research object,Midas Civil 2010 is used to build the beam-plate combination finite element model of arch box.The construction process of outsourcing concrete is calculated and the influence to the force and deflection of stiff skeleton arch bridge is investigated by different pouring scheme.And the stability of the construction process is also taken into consideration,which provides reference for the same kind of bridge construction.
出处 《重庆交通大学学报(自然科学版)》 CAS 北大核心 2012年第2期210-213,238,共5页 Journal of Chongqing Jiaotong University(Natural Science)
关键词 大跨劲性骨架拱桥 外包混凝土施工 浇注方案 施工稳定 long-span stiff skeleton concrete arch bridge outsourcing concrete construction pouring scheme construction stability
  • 相关文献

参考文献2

二级参考文献7

共引文献16

同被引文献194

引证文献26

二级引证文献111

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部