One-Step-Installation of Offshore Wind Turbine on Large-Scale Bucket-Top-Bearing Bucket Foundation 被引量:18

One-Step-Installation of Offshore Wind Turbine on Large-Scale Bucket-Top-Bearing Bucket Foundation
下载PDF
导出
摘要 In 2010,the first offshore wind turbine with integrated installation was established in Qidong sea area of Jiangsu Province,China,which led to the implementation phase of one-step-installation technique based on the design and construction of large-scale bucket-top-bearing (LSBTB) bucket foundation.The critical technique of LSBTB bucket foundation included self-floating towing,penetration with adjustment of horizontal levelness,removability and one-step-installation.The process of one-step-installation included the prefabrication of LSBTB bucket foundation in onshore construction base,installation and debugging of wind power,overall water transportation of foundation and wind power system,and installation of foundation and offshore wind turbine on the appointed sea area.The cost of one-step-installation technique was about 5 000 Yuan/kW,which was 30%-50% lower than that of the existing technique.The prefabrication of LSBTB bucket foundation took about two months.During the one-step-installation process,the installation and debugging of wind power and overall water transportation need about one to two days in sea area within 35 m depth.After the proposed technique is industrialized,the cost will be further reduced,and the installation capacity is expected to be up to 500 wind turbines per year. In 2010,the first offshore wind turbine with integrated installation was established in Qidong sea area of Jiangsu Province,China,which led to the implementation phase of one-step-installation technique based on the design and construction of large-scale bucket-top-bearing (LSBTB) bucket foundation.The critical technique of LSBTB bucket foundation included self-floating towing,penetration with adjustment of horizontal levelness,removability and one-step-installation.The process of one-step-installation included the prefabrication of LSBTB bucket foundation in onshore construction base,installation and debugging of wind power,overall water transportation of foundation and wind power system,and installation of foundation and offshore wind turbine on the appointed sea area.The cost of one-step-installation technique was about 5 000 Yuan/kW,which was 30%-50% lower than that of the existing technique.The prefabrication of LSBTB bucket foundation took about two months.During the one-step-installation process,the installation and debugging of wind power and overall water transportation need about one to two days in sea area within 35 m depth.After the proposed technique is industrialized,the cost will be further reduced,and the installation capacity is expected to be up to 500 wind turbines per year.
出处 《Transactions of Tianjin University》 EI CAS 2013年第3期188-194,共7页 天津大学学报(英文版)
基金 Supported by National High Technology Research and Development Program of China("863"Program,No.2012AA051705) National Natural Science Foundation of China(No.51109160) International Science and Technology Cooperation Program of China(No.2012DFA70490)
关键词 one-step-installation TECHNIQUE large-scale bucket-top-bearing BUCKET foundation self-floating towing penetration TECHNIQUE with adjustment of horizontal levelness removability TECHNIQUE construction and INSTALLATION cost one-step-installation technique large-scale bucket-top-bearing bucket foundation self-floating towing penetration technique with adjustment of horizontal levelness removability technique construction and installation cost
  • 相关文献

参考文献8

  • 1Lian Jijian,Ding Hongyan,Liu Run. Research Report on Key Technology of the CBF-3-150 Composite Bucket Foundation for Offshore Wind Turbines[R].Tianjin University,Tianjin,China,2010.
  • 2Lian Jijian,Sun Liqiang,Zhang Jinfeng. Bearing capacity and technical advantages of composite bucket foundation of offshore wind turbines[J].Transactions of Tianfin University,2011,(02):132-137.doi:10.1007/s12209-011-1644-y.
  • 3Christian LeBlanc Bakmar. The Monopod Bucket Foundation-Recent Experience and Challenges Ahead[OL].http://www.gl-group.com/pdf/Nol 2_Bakmar.pdf,2009.
  • 4Ding Hongyan,Li Zengzhi,Lian Jijian. Soil reinforcement experiment inside large-scale bucket foundation in muddy soil[J].Transactions of Tianjin University,2012,(03):168-172.doi:10.1007/s12209-012-1657-1.
  • 5Zhang Puyang,Ding Hongyan,Le Conghuan. Test on the dynamic response of the offshore wind turbine structure with the large-scale bucket foundation[J].Procedia Environmental Sciences,2012,(B):856-863.
  • 6Lian Jijian,Ding Hongyan,Zhang Puyang. Design of large-scale prestressing bucket foundation for offshore wind turbines[J].Transactions of Tianjin University,2012,(02):79-84.doi:10.1007/s12209-012-1661-5.
  • 7Ding Hongyan,Zhang Puyang,Le Conghuan. Construction and installation technique of large-scale topbeating bucket foundation for offshore wind turbine[A].Hohhot,China,2011.
  • 8Ultramarine Inc. Reference Manual for Moses[M].Houston,Texas,USA,2009.

同被引文献109

引证文献18

二级引证文献86

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部