浅谈压密注浆施工技术 被引量:5

Brief Analysis of Compaction Grouting Construction Technology
下载PDF
导出
摘要 在襄樊生活垃圾焚烧发电厂项目一期工程的施工过程中,众多的设备基础均坐落在新回填土上,且回填土深度达到3~9.5m。在设备基础施工完毕后局部出现沉降、倾斜等情况,因本项目为垃圾焚烧厂房,其大部分设备存在自重大,设备运行存在动荷载情况,并结合当地地基处理经验,采用压密注浆的方式对基础进行加固处理。 During the construction of project Xiangfan Waste-to-energy power plant,some of the equipment foundations were put on the refilling soil,and the depth of refilling is highly reach 3~9.5m.After finishing the construction of equipment foundation work,subsiding and tilting appeared in some places.For the waste incineration plant,most of its equipment are in big weight and face the problem of operation dynamic load.Combined with the experience of local foundation treatment,the compaction grouting method will be adopted for the foundation reinforcement.
出处 《施工技术》 CAS 北大核心 2013年第S1期127-130,共4页 Construction Technology
关键词 地基处理 压密注浆 施工技术 foundation treatment compaction grouting construction
  • 相关文献

同被引文献85

引证文献5

二级引证文献25

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部