期刊文献+

高土石坝施工计算机一体化仿真 被引量:17

Computer Integration Simulation for High Rockfill Dam Construction
下载PDF
导出
摘要 采用系统仿真方法对土石坝施工中的两个子系统,即运输上坝子系统和坝面填筑子系统的施工过程进行系统描述,分析了各自的运行特点,阐明内在联系,提出将二者有机结合起来进行一体化仿真.拓展了循环网络模型的概念,精减了现有循环网络模型中的职能节点和控制节点,并增设了一种新的综合节点,实现了面向资源的施工系统仿真建模.编制了仿真软件,并在某高土石坝施工设计中得到应用,仿真成果验证了该建模的有效性及仿真方法的先进性. Construction processes of two subsystems in rockfill dam are described in detail. They are haul and placement of rip-rap subsystem, which are interactional. An integration simulation is proposed to combine these two subsystems, and it impersonally demonstrates actual construction. Cycle Operation Network (CYCLONE) is used to build construction model for rockfill dam. With construction specialty, the conception of CYCLONE model is expanded. Compared with the existed model nodes, a new synthesis node is introduced while function and control nodes are deleted. It realizes system simulation construction model that faces resource.A simulation software for construction of rockfill dam is programmed and its application to an actual rockfill dam shows the software′s efficiency and practicability.
出处 《天津大学学报(自然科学与工程技术版)》 EI CAS CSCD 北大核心 2004年第10期872-877,共6页 Journal of Tianjin University:Science and Technology
基金 教育部高等学校优秀青年教师教学科研奖励计划(200166) 国家自然科学基金资助项目(50179023).
关键词 土石坝 施工 系统仿真 一体化仿真 循环网络模拟技术 rockfill dam construction system simulation integration simulation cycle operation network
  • 相关文献

参考文献6

二级参考文献4

共引文献55

同被引文献108

引证文献17

二级引证文献206

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部