摘要
阐述了某医院病区改造扩建设计拟定的结构改造方案 ,详细介绍了设计中解决建筑物沉降不均匀和新旧建筑物连接问题的解决方案 ,指出设计过程中应认真分析、比较结构方案 ,选出最佳方案。
This paper introduces the reconstruction plan of one hospital building for enlargement in floor number. According to uneven settlement and the connection between new and old buildings corresponding resolving plans are presented. Author points out that in order to select optimum scheme construction scheme should be seriously be compared and analyzed.
出处
《山西建筑》
2005年第5期36-37,共2页
Shanxi Architecture
关键词
改造设计
沉降
连接
reconstruction design, settlement, connection