唐山发电厂利用机组大修的热力试验曲线,分别找出各机组在各个负荷点下的热耗值,应用动态规化法解决机组的经济负荷分配问题,节省燃煤约占全厂煤耗的1%.
In Tangshan Power Plant,the thermal test curves of different units after overhaul are utilized to determine the heat rates at differant loads, and using dynamic programming to economically distribute loads among units. Fuel coal consumption rate is saved by about 1 %.
出处
《河北电力技术》
1994年第4期16-20,共5页
Hebei Electric Power
关键词
发电厂
动态规化法
负荷经济分配
Tangshan power plant dynamic programming economic load distribution coal consumption rate