大广坝水利水电枢纽是海南省最大的水电工程。在枢纽布置与设计中,进行了设计优化,并采用了多项新技术、新工艺,对水工布置、建筑设计、施工条件、工期和投资估算,作了全面的技术经济比较,从而加快了工程进度,节省了工程投资,获得显著的经济效益和社会效益。
The Daguangba project is the largest hydro project in Hainan Province.For optimizing the layout anddesign of the project a number of new techniques were adopted, and the technical economical analyses of thehydraulic structures arrangement,structural design,constructional conditions,construction Period, and investment estimation were made.As a result the construction was sped up,and a lot of project investment wassaved.
出处
《水力发电》
北大核心
1994年第2期6-9,共4页
Water Power
关键词
水利枢纽工程
布置
设计
最佳化
the Daguangba project,project layout,design optimization