A 600 MW unit went successfully into trial operation Construction quality stood the test of time
A 600 MW unit went successfully into trial operation Construction quality stood the test of time
-
1Liu Chunsheng.A 300-MW CFB unit put into operation[J].Electricity,2010,21(2).
-
2王青.浅谈农业经济信息技术[J].商情,2013(45):45-45.
-
3赵武强,但莎.凭借一库水 做大养鱼业[J].当代农村,2003(5):20-20.
-
4First phase project of Huaneng Yingkou Cogeneration Plant completed[J].Electricity,2010,21(1).
-
5The industury ran steadily[J].纺织服装周刊,2014(40):49-49.
-
6A 3600 MW power plant to be built in Xinjiang Hami[J].Electricity,2004,15(1):11-11.
-
7Inner Mongolia will construct Qingshuihe Power Plant[J].Electricity,2004,15(1):52-52.
-
8Laibin Power Plant planned to transfer to overseas[J].Electricity,1998(2):21-21.
-
9林琳.香江十月典亚艺博分外精彩[J].中国收藏,2015,0(9):38-39.
-
10彩熠.2016彩熠新品发布会受热捧[J].演艺科技,2016,0(3):62-62.