介绍了杭州湾跨海大桥高桩钢吊箱的设计与施工,阐述了采用有底钢吊箱施工深水高桩承台的施工工艺,及其吊箱的构造、检算和施工要点。可用于指导同类工程的设计和施工。
The design and erection procedure of steel hung cofferdam for pile foundation slab of Hangzhou Bay Cross - sea Bridge are discussed in detail. The structure of the steel hung cofferdam, construction technology , related calculations and key points of construction are presented, providing reference for similar projects.
出处
《石家庄铁道学院学报》
2005年第B06期14-18,24,共6页
Journal of Shijiazhuang Railway Institute
关键词
杭州湾跨海大桥
高桩承台
钢吊箱
Hangzhou Bay Cross-sea Bridge
pile foundation slab
steel hung cofferdam