摘要
针对目前水电工程造价管理存在的问题,基于霍尔三维结构图建立了水电工程造价管理的四维结构体系,分析了四个维度的含义及相互关系,在此基础上提出了基于四维结构体系的水电工程造价管理集成化模型,为水电工程造价管理提供了一种新的思路与方法。
According to the current existing problems in cost management of hydropower engineering,this paper establishes the four-dimensional structure system based on three-dimensional structure diagram of A.D.Hall and analyzes the meaning of each dimension and its correlation.And then the integrated model of cost management in hydropower engineering is put forward based on four-dimensional structure system.Thus,it provides new method for cost management of hydropower engineering.
出处
《水电能源科学》
北大核心
2010年第9期110-113,97,共5页
Water Resources and Power