摘要
为降低工程造价和施工难度,陕西某水利枢纽右岸溢洪道左导墙进行了优化定型实验。通过逐步修改导墙型式,并对每一修改的试验结果进行分析,最终达到了优化引渠进口边界条件的目的。
To lower prices and difficulties, an experiment to optimize the left diversion wall of the spillway on the right bank of a certain water hinge in Shanxi has been done. Step by step, the left diversion wall is amended, and the data gathered has been analyzed. Finally, the boundary conditions of a diversion canal are optimized.
出处
《河北建筑科技学院学报》
2005年第3期33-35,43,共4页
Journal of Hebei Institute of Architectural Science & Technology
关键词
溢洪道
导墙
优化试验
spillway
diversion wall
optimizing experiment