期刊文献+

基于知识的智能装配规划系统 被引量:9

Knowledge-based intelligent assembly planning system
下载PDF
导出
摘要 为了保证装配工艺的合理性和实用性,提出了基于知识的智能装配规划方法。该方法利用联接件装配工艺的特点和知识,进行装配序列规划,建立了基于联接件知识的装配实例库,生成装配序列的途径有典型实例的匹配、标准实例的匹配和运用有向联接件知识的装配序列规划。为了使产品的装配周期最短,并提高装配系统的柔性和可靠性,提出了基于多代理的装配任务规划方法,该方法综合考虑了装配操作时间和装配工具变换时间等因素。 In order to obtain more feasible and practical assembly process, a knowledge-based intelligent assembly planning was presented. After analyzing the characteristics of the assembly process of connectors, typical knowledge base and standard knowledge base were set up for assembly sequence planning. There were three ways to generate assembly sequences: (1) by retrieving the typical match, (2) by retrieving the standard match, and (3) by sequence planning using directed--connector. In addition, to minimize product assembly period and to improve the flexibility and reliability of assembly system, a multi--agent based approach for cooperative assembly task planning was presented, which considered factors such as the assembly processing time and the time needed for the manipulators to change tools.
出处 《计算机集成制造系统》 EI CSCD 北大核心 2005年第12期1692-1697,1768,共7页 Computer Integrated Manufacturing Systems
基金 国家973计划资助项目(2002CB312106) 浙江省自然科学基金资助项目(602092)~~
关键词 产品模型 装配规划 序列规划 知识推理 product model assembly planning sequence planning knowledge--based reasoning
  • 相关文献

参考文献12

  • 1ZHA X F,DU H.A PDES/STEP-based model and system for concurrent integrated design and assembly planning[J].Computer-Aided Design,2002,14(8):1087-1110.
  • 2LEE S.Subassembly identification and evaluation for assembly planning[J].IEEE Transaction on System,Man,and Cybernetics,1994,24(3):493-503.
  • 3CHEN P C L,PAO Y H.An integration of neural network and rule-based systems for design and planning of mechanical assemblies[J].IEEE Transaction on System,Man,and Cybernetics,1995,23(5):1359-1371.
  • 4YIN Z P,DING H,LI H X,et al.A connector-based hierarchical approach to assembly sequence planning for mechanical assemblies [J].Computer-Aided Design,2003,35(1):38-56.
  • 5HIRAI J I,NAGATA T.Agent-oriented and distributed assembly task planning for multiple manipulators[A].Proceedings of the 1994 IEEE/RSJ/GI International Conference on Intelligent Robots and Systems[C].Munich,Germany:IEEE Press,1994.113-118.
  • 6DEL V C,CAMACHO E F.Automatic assembly task assignment for a multirobot environment[J].Control Engineering Practice,1996,4(7):915-921.
  • 7KOLISCH R.Integrated scheduling,assembly area-and part-assignment for large-scale,make-to-order assemblies[J].International Journal of Production Economics,2000,64(1):127-141.
  • 8FRAILE J C,PAREDIS C J J,WANG C H,et al.Agentbased planning and control of a multi-manipulator assembly system[A].Proceedings of the 1999 IEEE International Conference on Robotics and Automation [C].Michigan,USA:IEEE Press,1999.1219-1225.
  • 9董天阳 童若锋 张玲.基于知识的智能装配规划技术研究[A]..第五届全球智能控制与自动化大会[C].杭州:IEEE,2004.2748-2752.
  • 10DONG Tianyang,TONG Ruofeng,DONG Jinxiang,et al.Knowledge-based assembly sequence planning system[A].Proceedings of the 8th International Conference on Computer Supported Cooperative Work in Design[C].Xiamen:IEEE Press,2004.516-521.

同被引文献62

引证文献9

二级引证文献44

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部