摘要
结合某培训中心游泳池混凝土施工实例,介绍了大体积混凝土施工中通过控制配合比、浇筑方法和养护等一系列措施,有效地解决了大体积预拌混凝土冬季施工容易出现变形裂缝的质量通病。
Combined with concrete construction work of swimming pool of one training center the control of mix proportion, pouring method, maintenance and other measttres in construction process of mass concrete are introduced, which effectively resolve the quality problem of deformation cracks produced in winter construction of mass premixed concrete.
出处
《山西建筑》
2006年第4期164-165,共2页
Shanxi Architecture
关键词
大体积混凝土
裂缝
冬季施工
配合比
mass concrete, crack, winter construction, mix proportion