摘要
介绍UM71模拟电路的制作过程,设备调试步骤,并举例说明联锁试验的技术条件,区间信号联锁的相互关系。
This paper introduced the process of making UM71 simulation circuit and the steps of equipment debugging, and illustrate with example the technique term of interlock test, the correlation of block section signaling interlock.
出处
《铁道通信信号》
2006年第6期9-11,共3页
Railway Signalling & Communication
关键词
模拟
调试
联锁
Simulation, Debugging, Interlocking