摘要
简要叙述深圳地铁一期工程概况,介绍工程进度控制的主要措施;通过工程实例,说明事前控制和综合协调在进度控制中的作用;阐述进度控制的体会,分析存在的经验和教训。
This paper makes a brief introduction to the general situation and the major measures for schedule control in Shenzhen Metro Phase 1, emphasizing through practical cases the roles played by the control in advance and integrated coordination in schedule control. It also analyzes the lessons learned in schedule control.
出处
《都市快轨交通》
2006年第3期11-14,共4页
Urban Rapid Rail Transit
关键词
深圳地铁一期工程
进度控制
事前控制
施工接口
综合协调
Shenzhen metro phase 1
schedule control
control in advance
construction interface
integrated coordination