摘要
本文着重介绍广州体育馆主场馆屋盖钢结构的测量施工技术。本工程的测量施工复杂,本文对测量施工过程作出总结,为同类工程起借鉴作用。
This text recommends the room of Guangzhou Gymnasium to build the measurement construction technology of the steel construetion emphatically. The measurement construction of this project is complicated, this text summarizes in measuring the construction course, play a drawing lessons from role for the similar project.
出处
《福建建筑》
2006年第4期85-86,共2页
Fujian Architecture & Construction
关键词
屋盖
钢环梁
主桁架
辐射桁架
测量放线
定位
控制点
水准仪
塔尺
全站仪.
the room overlays, the steel surrounds the roof beam, main truss, radiates the truss, measuring putting in the line , makes a reservation , control point , level gage , tower chi , the appearance stands completely.