摘要
针对群力堤防工程建设征地拆迁工作量大、复杂等特点,对征地拆迁工作提出了新的观点和认识,并对具体操作实施对策等进行了充分的研究和探讨。
To the special characters of making a requisition of land of Qunli dyke project, the new thought and point of making a requisition are put forward , and measure of them is researched and talked about.
出处
《水利科技与经济》
2006年第7期409-410,共2页
Water Conservancy Science and Technology and Economy
关键词
亚行贷款
征地拆迁
对策
群力堤防
load by Asia Bank
making a requisition
conter measures
Qunli Dyke