摘要
本文利用三角模糊数计及自然来水量及负荷的不确定性,用模糊机会约束来描述水库蓄水量约束及线路的安全约束,并通过线性规划求解本文模型。本文最后给出了一样例系统的计算结果。
Uncertainties of inflows and loads are regarded as fuzzy numbers in this paper,and reservoir volume's constraints and lines' security constraints are taken into account by fuzzy chance constraints,and a linear programming is used to calculate the model in this paper. At last a result about a sample system is given.
出处
《中国电机工程学报》
EI
CSCD
北大核心
1996年第6期430-433,共4页
Proceedings of the CSEE