期刊文献+

工程量清单计价与招投标管理 被引量:3

The Management of Construction Pricing and Bidding
下载PDF
导出
摘要 我国传统建筑产品价格普遍采用“量价合一”的静态管理模式,而文章则提出在建设工程施工招标时,适宜采用“量价分离”的市场模式,并重点论述了该模式的重要意义,且提出了当前工程量清单招标中存在的问题以及解决的对策.结果表明,现有工程量清单计价模式已能够真正实现市场机制,决定工程造价,但仍然需要进一步补充与完善. Traditionally, a static "quantity and price" managerial mode is widely adopted as the pricing policy in China's construction field. Yet, as the paper points out, a market mode that separates quantity from price seems more proper in inviting bids for construction projects. This paper expounds on the significance of this mode with special emphasis, points out some of the existing problems with current bidding practice, and then supplies some countermeasures. The results show that the new pricing mode is already capable of realizing the determination of construction cost by the mechanism of market, and yet there is still space for complement: and improvement.
作者 孙彦
机构地区 徐州工程学院
出处 《徐州工程学院学报》 2006年第9期50-52,66,共4页 Journal of Xuzhou Istitute of Technology
关键词 工程计价 投标 管理 construction pricing policy bidding management
  • 相关文献

参考文献6

二级参考文献4

共引文献13

同被引文献12

引证文献3

二级引证文献21

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部