阳泉五矿热电厂锅炉超温等问题的解决

How Boiler Overheat and other Problems were Solved at tile Tllernlal Power Plant of Yangquan Mine No. 5
下载PDF
导出
摘要 该文介绍35t/h鼓泡流化床锅炉试运行时,过热器超温,后去除2m卫燃带,汽温正常.再投运后又发现出力不足、流化床前后温差太大等问题,经过调研、分析、调整后,上述问题得以——解决. Abstract The paper reports that the superheater of a 35 t/h bubbling fluidized bed boiler got overheated during its trial run' After having removed a tube length of Zm from the combustion shielding zone, the steam temperature became normal. But,after commissioning, it was found that the output was inadequate and tile temperature difference before and after the fluidized bed has become excessive' Following sollle thorough investigation, analyzing and adjustment work all these problems have been Successively solved.
作者 王永平
出处 《发电设备》 1996年第9期16-18,共3页 Power Equipment