中国水利水电科学研究院承担丰满大坝全面治理方案可行性研究大坝长期安全性评价工作,现又对福建水东水电站大坝补强加固工程的经验进行了较系统的总结,可供类似工程借鉴。
The China Institute of Water Resources and Hydropower Research has taken on the working of the long-term safety evaluation of the Feng Man dam, which is involved in the Feasibility Research of the All-round Treatment Schedule for the Feng Man Dam. This paper summarizes the experiences of the dam of the Shuidong Hydropower Station, so as to be referred by the similar engineering.
出处
《山西水利科技》
2007年第2期1-3,共3页
Shanxi Hydrotechnics
关键词
混凝土大坝
补强加固
经验总结
concrete dam reinforcement experience summarization