摘要
本文通过平八矿在大倾角综采面回收重型设备的实践,阐述了大倾角综采面回收重型设备的安全技术管理经验以及存在的问题,并提出几点认识和建议。
Through the practice of heavy equipment recovery at the large-inclined comprehensive mining face in Eighth coal mine of Ping Mei Group, safety technical management experiences and existent problems in regard to the heavy equipment recovery in the large-inclined comprehensive mining face are introduced, besides that, some understandings and proposals has been made.
出处
《煤矿现代化》
2007年第3期9-11,共3页
Coal Mine Modernization
关键词
综采
大倾角
重型设备
回收工艺
安全管理
comprehensive mining large-inclined heavy equipment recovery process safety management