1Lauri Koskela . Special Issue: Lean Construction[J].VTT Building Technology, 2001(1).
2Gregory A. Howell. What is Lean Construction[J]. Proceedings IGLC- 7, University of California. 1999.6.
3Mohammed Fadhil Dulaimi, Caroline Tanamas. The Principles and Application of Lean Construction in Singapore.
4Ichael Horman,Russell Kenley, Victor Jennings. A Lean Approach to Construction:An Historical Case Study. The University of Melbourne, Australia.
5David Seymour, John Rook, Darry Crook. Doing Lean Construction and Talking about Lean Construction. University of Birminghan,Birminghan, 1997.2.
6Glenn Ballard. Can Pull Techniques Be Used in Design Management. Presented at the Conference on Concurrent Engineering in Construction, Helsteki, Finland. 1999,(8):26-27.
3Gurevich U, Sacks R. Examination of the effects of a KanBIM production control system on subcontractors' task selections in interior works [ J ]. Automation in Construction, 2014 ( 37 ) : 81- 87.
4Costin A, Pradhananga N, Teizer J, et al. Cooperative Design, Visualization, and Engineering [ M ]. Springer Berlin Heidel- berg,2012:41- 48.
5Ghio V A, Valle E, Rischmoller L. Preplanning: A rewarding experience [ J ]. Retrieved October, 1997 ( 11 ) : 2002.
6Wyatt A, Mohamed S, TiUey P. A. Indicators of design and documentation deficiency [ C ]. Proceedings of the Fifth Annual Conference of the International Group for Lean Construction, 1997 : 137-148.
7Fischer M, Akinci B. O, Brien W. Importance of Site conditions and capacity allocation for construction cost and performance: A case study[ C ]. Int. Conf. on Lean Construction, 1997:77- 89.
8Russell M M, Howell G, Hsiang S M, et al. Application of Time Buffers to Construction Project Task Durations [ J ]. Journal of Construction Engineering and Management, 2013,139 ( 10 ) : 79-82.
9Perlman A, Sacks R, Barak R. Hazard recognition and risk per- ception in construction [ J ]. Safety science,2014 (64) :22-31.