工程项目设计与施工整合研究 被引量:3

下载PDF
导出
摘要 工程项目因为专业分工导致了分离,设计与施工的分离带来成本增加、工期延长等问题,而业主对工程建设的短工期、低费用有着迫切要求,因此需要一个整合的管理模式。本文通过分析设计与施工整合的动因,提出了整合的组织机制和工作机制,强调要采用新的工程建造体系,以期提高工程建设的效率。
作者 陈林 苏振民
出处 《商业时代》 北大核心 2007年第25期66-67,共2页 Commercial
  • 相关文献

参考文献2

二级参考文献8

  • 1Lauri Koskela . Special Issue: Lean Construction[J].VTT Building Technology, 2001(1).
  • 2Gregory A. Howell. What is Lean Construction[J]. Proceedings IGLC- 7, University of California. 1999.6.
  • 3Mohammed Fadhil Dulaimi, Caroline Tanamas. The Principles and Application of Lean Construction in Singapore.
  • 4Ichael Horman,Russell Kenley, Victor Jennings. A Lean Approach to Construction:An Historical Case Study. The University of Melbourne, Australia.
  • 5David Seymour, John Rook, Darry Crook. Doing Lean Construction and Talking about Lean Construction. University of Birminghan,Birminghan, 1997.2.
  • 6Glenn Ballard. Can Pull Techniques Be Used in Design Management. Presented at the Conference on Concurrent Engineering in Construction, Helsteki, Finland. 1999,(8):26-27.
  • 7顾新建,祁国宁.德国的精益管理的思想[J].工厂建设与设计,1998(2):40-42. 被引量:13
  • 8王频.精益生产在日本的发展状况[J].成组技术与生产现代化,2002,19(1):1-5. 被引量:17

共引文献43

同被引文献36

  • 1满庆鹏,李晓东.基于普适计算和BIM的协同施工方法研究[J].土木工程学报,2012,45(S2):311-315. 被引量:40
  • 2邱光宇,刘荣桂.在我国建筑业推行精益建设的研究[J].建筑经济,2007,28(1):56-58. 被引量:17
  • 3Gurevich U, Sacks R. Examination of the effects of a KanBIM production control system on subcontractors' task selections in interior works [ J ]. Automation in Construction, 2014 ( 37 ) : 81- 87.
  • 4Costin A, Pradhananga N, Teizer J, et al. Cooperative Design, Visualization, and Engineering [ M ]. Springer Berlin Heidel- berg,2012:41- 48.
  • 5Ghio V A, Valle E, Rischmoller L. Preplanning: A rewarding experience [ J ]. Retrieved October, 1997 ( 11 ) : 2002.
  • 6Wyatt A, Mohamed S, TiUey P. A. Indicators of design and documentation deficiency [ C ]. Proceedings of the Fifth Annual Conference of the International Group for Lean Construction, 1997 : 137-148.
  • 7Fischer M, Akinci B. O, Brien W. Importance of Site conditions and capacity allocation for construction cost and performance: A case study[ C ]. Int. Conf. on Lean Construction, 1997:77- 89.
  • 8Russell M M, Howell G, Hsiang S M, et al. Application of Time Buffers to Construction Project Task Durations [ J ]. Journal of Construction Engineering and Management, 2013,139 ( 10 ) : 79-82.
  • 9Perlman A, Sacks R, Barak R. Hazard recognition and risk per- ception in construction [ J ]. Safety science,2014 (64) :22-31.
  • 10李书全,朱孔国.基于三螺旋理论的精益建设实施研究[J].管理现代化,2009,29(5):21-23. 被引量:2

引证文献3

二级引证文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部