1Kerr A D,Moroney B E.Track transition problems and remedies[J].Bulletin 742-American Railway Engineering Association,1995,742:267-297.
2Kerr A D.A method for determining the track modulus using a locomotive or car on multi-axle trucks[J].Proceeding American Railway Engineering Association.1987,84(2):270-286.
3Kerr A D.On the vertical modulus in the standard railway track analyses[J].Rail International,1989,235(2):37-45.
4Moroney B E.A study of railroad track transition points and problems[D].Department of Civil Engineering,University of Delaware,1991.
5LEI Xiao-yan,MAO Li-jun.Dynamic response analyses of vehicle and track coupled system on track transition of conventional high speed railway[J].Journal of Sound and Vibration,2004,271(3):1133-1146.
6Vesic A S.Beams on elastic subgrade and the winkler hypothesis[A].Proceedings 5th Int Conf soil Mech Found Engng[C].Paris,1963,Vol.1:845-850.
7Heelis M E,Collop A C,Dawson A R,et al.Transient effects of high speed trains crossing soft soil[A].Geotechnical Engineering for Transportation Infrastructure[C].Barends et al.(eds).Balkema,Rotterdam,1999.1809-1814.
8Belzer A I.Acoustics of solids[M].Berlin:Springer-Verlag,1988.