期刊文献+

初期雨水调蓄池运行效率的计算机模型评估 被引量:17

Evaluation of Computer Model for Operation Efficiency of Initial Rainwater Detention Tank
下载PDF
导出
摘要 利用排水系统水力模型对上海世博园区的规划雨水系统进行了水力模拟,评价了初期雨水调蓄池控制城市面源污染的长期效果。结果表明:按照调蓄容量为30m3/hm2的设计标准,在上海市平水年降雨条件下,调蓄池每年能够拦蓄约50%的雨水径流量;在分流制雨水系统具有一定初期效应的情况下,上述初期雨水调蓄池污染物的去除率为42.9%~67.4%;对于半分流制系统,在降雨期间允许向污水总管截流初期雨水的条件下,调蓄池具有更高的截流比例。 Hydraulic model for drainage system was used to hydraulically simulate the planning rainwater system in Shanghai EXPO area, and evaluate the long-term efficiency of initial rainwater detention tanks for controlling urban non-point pollution. The result shows that according to the design standard of 30 m^3/hm^2, the detention tanks can annually intercept about 50% storm runoff under average annual rainfalls in Shanghai. When the separate rainwater system has a certain initial effect, the pollutants removal rates of the detention tanks are between 42.9% and 67.4%. For the semi-separate system, if interception is allowed during rainfall, the detention percentage is higher.
出处 《中国给水排水》 CAS CSCD 北大核心 2007年第18期47-51,共5页 China Water & Wastewater
关键词 初期雨水 面源污染 调蓄池 水力模型 长期模拟 initial rainwater non-point pollution detention tank hydraulic model longterm simulation
  • 相关文献

参考文献6

  • 1US EPA.Results of the National Urban Runoff Program[R].Washington:US EPA,1987.
  • 2US EPA.Methodology for Analysis of Detention Basins for Control of Urban Runoff Quality (EPA440/5-87 -001)[R].Washington:US EPA,1986.
  • 3Wallingford software Ltd.InfoWorks CS online help[M]:UK:Wallingford Software Ltd,2005.
  • 4US EPA.Storm Water Management Model,Version 4:User's Manual(EPA/600/3-88/001a)[R].Washington:US EPA,1988.
  • 5Chapman R E.WaPUG user note No.15:Storage Compensation(Version 2)[M].UK:British Hydrological Society,1996.
  • 6谭琼,李田,高秋霞.上海市排水系统雨天出流的初期效应分析[J].中国给水排水,2005,21(11):26-30. 被引量:21

二级参考文献7

  • 1Bertrand-Krajewski Jean-Luc, Chebbo Ghassan,Saget Agnes. Distribution of pollutant mass vs. volume in stormwater discharges and the first flush phenomenon[J]. Wat Res, 1998,32 (8) :2341-2356.
  • 2Lee Jun Ho, Bang Ki Woong. Characterization of urban stormwater runoff[J]. Wat Res, 2000,34 (6): 1773-1780.
  • 3Larsen Torben. First flush effects in an urban catchment area in aalborg[J]. Wat Sci Tech, 1998,37 (1): 251-257.
  • 4Saget Agnes, Chebbo Ghassan, Bertrand-Krajewski JeanLuc. The first flush in sewer systems [J]. Wat Sci Tech,1996,33(9) :101-108.
  • 5Gupta K, Saul A J. Specific relationships for the first flush load in combined sewer flows [J]. Wat Res, 1996,30(5) :1244-1252.
  • 6Stahre, Urbonas. Stormwater Detention [M]. Englewood Cli. s: Prentice Hall, Inc. , 1990.
  • 7Wanielista, Yousef. Stormwater Management [M]. New York :John Wiley and Sons, Inc. , 1993.

共引文献20

同被引文献170

引证文献17

二级引证文献120

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部