摘要
取土弃渣场是公路建设项目的重要辅助工程。以京承高速公路(密云沙峪沟至市界)工程为例,探讨3S技术在公路取土弃渣场规划设计中的应用方法。借助3S技术的空间数据采集、管理、分析和地面定位等多种功能,拓宽取土弃渣场选址视野和比选空间,全面综合分析,对于提高选址的合理性和工作效率具有重要作用,而且有利于取土弃渣场后期的实时跟踪管理。
The taking sites of soil and waste is an important assistant project for the road construction project with high grade. Taking the Jing-Cheng (Miyun Shayu to boundary of city) highway for example, the application of 3S to the planning and designing of the taking sites of soil and waste for the road construction project was discussed. In virtue of the functions of 3S, such as the collection, management and analysis of spatial data etc, the view on selecting the taking sites of soil and waste and the range of comparison can be developed, and comprehensively analyzed. These contributed some important benefits to improve the rationality of selecting the sites and the work efficiency. Furthermore, the technology of 3S will also be available to the real-time and tracking sites of management of the taking soil and waste subsequently.
出处
《中国水土保持科学》
CSCD
2007年第5期88-93,共6页
Science of Soil and Water Conservation
关键词
3S技术
公路建设项目
取土弃渣场
3S technology
the road construction project
taking sites of soil and waste