摘要 国家体育馆屋面采用双向张弦网格结构,其预应力施工具有一定的难度。介绍了预应力施工方案及施工前期的一些准备工作,如施工仿真模拟计算、张拉工装的设计。简单介绍了预应力施工监测方案和张拉过程中的同步控制措施,并结合仿真计算结果和现场监测结果,提出了此类结构的预应力施工技术和特点。 The roof structure system of National Gymnasium is bidirectional truss string, and its prestress construction is very difficult. A detailed description of the prestress construction plan is given, as well as some prophase preparations such as construction simulation calculation and prestress device design. The construction monitor plan and the synchronism control measures are briefly accounted. According to the construction simulation results and site construction monitoring results, the characteristics of prestress construction technology are proposed.
出处 《施工技术》 CAS 北大核心 2007年第11期6-8,共3页 Construction Technology
关键词 国家体育馆 双向张弦结构 预应力 仿真计算 National Gymnasium bidirectional string structure prestress construction simulation
  • 相关文献

参考文献2

二级参考文献8

共引文献6

同被引文献140

引证文献18

二级引证文献73

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部