摘要
燃气-蒸汽联合循环电站启动调试工作程序有其自身的特殊性,本文简要介绍郑州燃气电站机组主要启动调试程序、重要调试项目,供同类机组调试参考。
The procedure of start-up and commissioning program of gas-steam combined cycle power plant has its special features.This paper gives an introduction to the main start-up and commissioning procedure and some important commissioning items of the units in Zhengzhou CCPP,which can give some information to other similar units.
出处
《河南电力》
2008年第1期60-64,共5页
Henan Electric Power