摘要
通过应用UDEC 4.0软件,对E310101工作面开采过程中覆岩运动规律进行了模拟,结果表明工作面垮落带高度11.2 m,裂隙带高度为37.2 m,“O”型圈分布在距离3#煤层23.83 m、在工作面一侧距工作面15-45 m采空区内。在此基础上确定了该工作面瓦斯抽放的高位钻孔参数,并进行了现场实施。
The numerical si mulation results of overlying strata move laws during mining face E310101 by udec show that the height of caving zone is 11.2 meters, and the height of fractured zone is 37.2 meters, and the shape encloses O near face distributes range from 15 meters to 45 meters of face in goal. According to above simulated results, the construction para meters of high level borehole are fixed.
出处
《中国煤炭》
北大核心
2008年第8期93-95,99,共4页
China Coal
基金
教育部留学回国人员科研启动基金资助项目(2007~1108)
高等学校优秀青年教师教学科研奖励。
关键词
高位钻孔
瓦斯抽放
“O”形圈
数值模拟
high level borehole, gas draining, shape encloses O, numerical simulation