摘要 在煤矿电网中,由于单相接地故障而引起的母线电压互感器(PT)烧毁的现象时有发生。文章依据电网单相接地故障时的等效模型仿真了PT一次侧电流的暂态特性,认为引发PT故障的主要原因为煤矿电网单相接地时电容电流值较大。利用电力系统仿真软件PSCAD/EMTDC对一组6 kV PT进行仿真,并比较了PT一次侧经非线性电阻(消谐器)接地、PT开口三角处并电阻和系统中性点经消弧线圈接地的3种解决措施。文章最后指出中性点经消弧线圈接地是解决煤矿电网中单相接地故障的最合适方法。 The burning out of voltage transformer happens occasionally in coal mine power network because of single-phase grounded fault. According to equivalent model of single-phase grounded fault of power network, simulation analysis was presented on the transient characteristics of the primary side current of PT in the paper. It was considered that the causation of fault of PT is large single phase-to- ground capacitive current in coal mine power network. And a group of voltage transformer in 6 kV distribution system was simulated based on PSCAD/EMTDC. Three kinds of eliminating resonance method in different condition were compared including connecting a nonlinear resistance to neutral point of high voltage side of three-phase PT, connecting a damping resistance to the secondary assistant windings of three-phase PT, grouding neutral point through arc suppression coil. At last the paper indicated that neutral grounde power network.
出处 《工矿自动化》 北大核心 2008年第5期26-29,共4页 Journal Of Mine Automation
关键词 煤矿电网 电压互感器 故障 中性点接地系统 消弧线圈 PSCAD coal mine power network, voltage transformer, fault, neutral grounded system, arc suppression coil, PSCAD
  • 相关文献

参考文献8

二级参考文献31

共引文献103

同被引文献29

引证文献2

二级引证文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部