期刊文献+

拉西瓦水电站导流洞堵头结构与稳定分析 被引量:6

Structure and Stability Analysis of Diversion Tunnel Plug for Laxiwa Hydropower Station
下载PDF
导出
摘要 导流隧洞堵头的稳定性与大坝同等重要。在抗剪断理论的基础上,采用非线性有限元分析方法,对拉西瓦水电站导流隧洞堵头进行了三维有限元计算,并对堵头结构特征位置的应力、变形以及堵头整体的抗剪断安全系数等方面展开了细致深入的分析。结果表明:44m长度堵头部分可以满足初期封堵需要,65m长度可以满足后期水库蓄水封堵需要,分段封堵分期挡水方案是可行的。 The stability of the diversion tunnel plug is important as the dam. The diversion tunnel plug of LaXiWa hydropower station was analyzed by the method of 3-D finite element on the basis of shear resistance theory. And analysis were conducted based on the stress, deformation of plug, and shear resistance coefficient. It was shown that adopting 44m-long plug and 65m-long plug can meet the requirements both for initial stages and later stage respectively. Obviously the plugging by sections and by periods was feasible.
出处 《电网与清洁能源》 2008年第11期71-75,共5页 Power System and Clean Energy
关键词 拉西瓦水电站 导流隧洞 堵头 有限元法 Laxiwa Hyaropower Station diversion tunnel plug FEM
  • 相关文献

参考文献5

二级参考文献16

  • 1伍鹤皋,苏凯,春光魁,罗林.导流隧洞堵头稳定性分析[J].武汉大学学报(工学版),2006,39(3):6-10. 被引量:14
  • 2杨静安,伍鹤皋,苏凯,石青春,宋亦农.大型水电站导流洞堵头结构与稳定分析[J].水电能源科学,2007,25(1):94-97. 被引量:19
  • 3水利电力部.水利水电工程水工设计编制说明[MI[M].北京:水利电力出版社,1990..
  • 4DL5108—1999.混凝土重力坝设计规范[S].[S].,..
  • 5上海勘测设计研究院.混凝土拱坝设计规范(SL282-2003)[S].北京:中国水利水电出版社,2003.71-76.
  • 6Bathe K J.Wilson E L. Numerical methods in finite element analysis. Englewood Cliffs. New Jersey. Prentice-Hall, Inc. ,1976.
  • 7SL282-2003.混凝土拱坝设计规范[S].[S].,..
  • 8DL5108-1999.混凝土重力坝设计规范[S].[S].,..
  • 9SL282—2003.混凝土拱坝设计规范[S].[S].,..
  • 10华东勘测设计研究院.混凝土重力坝设计规范(DL5108-1999)[S].北京:中国电力出版社,2001.

共引文献54

同被引文献44

引证文献6

二级引证文献16

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部