摘要
介绍了焦化厂A2/O生化系统的工艺流程,总结介绍了在系统装置尚未完工的情况下,边建设边开工调试的经验,以及正常运行的工况。
The technological flow of A^2/O biochemical system in Coking Plant was introduced, the experiences of commissioning and establishing for this system being performed synchronously in the case that the system unit were not finished were summarized.
关键词
污水处理
焦化酚氰污水
A^2/O工艺
Sewage Disposal Coking Phenol-cyanogens Waste-water A^2/O Process