摘要
介绍徐州彭城电厂三期工程1 000 MW超超临界机组的设计和设备情况,系统阐述机组启动调试的程序安排和主要特点,选取几个关键控制节点,就2台机组的调试进行分析比较,对2台机组启动调试过程中出现的主要问题进行原因分析,并提出解决的方法和采取的措施,对同类型机组启动调试具有一定的借鉴和参考价值。
The design and the performance of the 1 000 MW ultra-supercritical units in Xuzhou Pengcheng Power Plant Ⅲ project are introduced.The commissioning arrangement and characteristics are set forth systematically.By selecting several key nodes and two units commissioning comparison,the main problems of commissioning process are analyzed,besides methods and countermeasures are put forward.It offers a reference to commissioning for the same type units.
出处
《湖南电力》
2010年第S1期7-13,共7页
Hunan Electric Power
关键词
1000MW超超临界机组
启动调试
程序
特点
1 000 MW ultra-supercritical unit
start-up commission
program
characteristic