基于社会效益的BOT项目特许权期决策分析 被引量:29

Analysis on Concession Term Decisions of BOT Projects Based on Social Benefits
下载PDF
导出
摘要 以社会效益作为政府确定BOT项目特许权期的决策准则,对文献[8]所给出的S-L模型仅以政府的直接货币收益非负作为决策准则而存在的缺陷进行了修正,得到了基于社会效益的特许权期决策模型。修正后的模型考虑了不同项目在社会效益上的差异,为政府提供了与项目公司进行特许权期谈判的三个准则,这些准则能够在保证项目公司投资积极性的前提下,使项目实现最大的社会效益。最后以算例对修正后模型的可行性进行了验证。 The concession term model given by document [ 8 ] only considered the government's income of currency which can not be less than zero. This paper develops another concession term model of BOT projects by modifying that model based on the principle of social benefits. Furthermore, the modified model considered the difference of social benefits in different projects and provide government three negotiation rules, which all of them can ensure protects produce maximum social benefits and also can protect project company's enthusiasm on investing at the same time. At last, an application demonstrates the feasibility of the modified model.
出处 《管理工程学报》 CSSCI 北大核心 2009年第2期125-130,共6页 Journal of Industrial Engineering and Engineering Management
基金 国家自然科学基金资助项目(70371045)
关键词 社会效益 BOT 特许权期 项目公司 social benefits BOT concession term project company
  • 相关文献

参考文献9

二级参考文献5

  • 1M.M. Kumarsawamy, X.Q. Zhang. Governmental role in BOT-led infrastructure development [ J ]. International Journal of Project Management, 2001,19,195 - 205.
  • 2L.Y.shen,H.Li,Q.M.Li.Alternative concession model for build operate transfer contract projects[J].Journal of construction Engineering and management,2002,128(4):326~330.
  • 3Beijing Engineering Consultant Corporation(BECC).Guideline on the application of BOT project[M].Beijing:Earthquake publication,1995.15~64.
  • 4刘伟华译.Risk management[M].北京:中信出版社,2002.100-129.
  • 5李启明,申立银.基础设施BOT项目特许权期的决策模型[J].管理工程学报,2000,14(1):43-46. 被引量:94

共引文献111

同被引文献247

引证文献29

二级引证文献104

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部