摘要
主要介绍了华能玉环电厂4×1 000MW机组工程的发电机无刷励磁系统的配置、特点以及调试情况,并针对调试实践过程中暴露的问题进行了分析与解决,在实践中效果理想。
The paper introduces briefly configuration, features and commissioning conditions of generator brushless exciting system of Huaneng Yuhuan Power Plant 1000 MW unit. It also analyses problems occurring during commissioning with solution, which proves ideal in construction.
出处
《电力建设》
2009年第7期79-82,共4页
Electric Power Construction
关键词
1000MW机组
无刷励磁
电气调试
1 000 MW unit
brushless excitation
electrical commissioning