摘要
简要介绍了蚌明高速公路AC13上面层的配合比设计及现场施工控制手段,阐述了配合比及现场施工关键控制要点。
The mixture ratio design of the AC13 top cover of Bang-Ming Freeway and the means of controlling the field engineering construction are introduced briefly .The mixture ratio and the critical control points about the field engineering construction are represented.
出处
《工程建设与设计》
2009年第7期130-133,共4页
Construction & Design for Engineering
关键词
高速公路
上面层
配合比
施工质量控制
high way
top cover
mixture ratio
the control of construction quality