8Babayev D.A.Mathematical Models for Optimal Timing of Drilling Multilayer Oil and Gas Fields[J].Management Science,1975,21 (12):1361-1369.
9McFarland J.W.,Lasdon W.L,Verne L.Development Planning and Management of Petroleum Reservoirs Using Tank Model and Non-Linear Programming[J].Operations Research,1984,32 (2):270-289.
10Wackowski R.K.,Stevens C.E.,Masoner L.O.,Attanucci Vince,Larson J.L.,Aslesen K.S.Applying Rigorous Decision Analysis Methodology to Optimization of a Ter-Tiary Recovery Project:Rangely Weber Sand Unit,Colorado[M].London:Society of Petroleum Engineers,1992.24-34.