摘要 国道主干线广州绕城公路西环南段北江特大桥主墩设计为整体式高桩承台,采用钢吊箱围堰施工。介绍了173t整体式钢吊箱围堰设计方案,阐述了钢吊箱围堰在深水高桩承台施工中的应用及大体积混凝土施工的温控措施。 The main pier of the Beijiang River Bridge in the south section of the west part of Guangzhou Orbital Highway was designed as integral elevated pile cap, using steel suspending cofferdam construction technology. This paper introduced the design scheme of 173t integral steel suspending cofferdam, and expounded the application of steel suspending cofferdam of elevated pile foundation to deep water and the temperature control measures of mass concrete construction.
作者 梅瑞泰
出处 《交通科技》 2009年第4期43-46,共4页 Transportation Science & Technology
关键词 深水高桩承台 钢吊箱围堰 大体积混凝土 温控 elevated pile foundation in deep water steel suspending cofferdam mass concrete temperature control
  • 相关文献

参考文献8

二级参考文献3

共引文献856

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部