摘要
简要介绍了凤凰二桥主桥承台施工过程有底钢吊箱的设计、拼装、下沉、堵漏、浇注封底混凝土等有关施工技术。
This paper briefly introduces about the construction of the main bridge of Phoenix Ⅱ Bridge,including the design of hanging steel boxed with bottom,the construction methods of assembling,lowing,stopping up the leaks,depositing the sealing bottom concrete.
出处
《广东土木与建筑》
2009年第8期33-35,共3页
Guangdong Architecture Civil Engineering
关键词
钢吊箱
承台
围堰
施工方法
hanging steel boxed
cushion cap
cofferdam
construction methods