高面板堆石坝渗流控制关键技术问题探讨 被引量:8

Key Technology Problems of Seepage Control for Building High Concrete Face Rockfill Dam
下载PDF
导出
摘要 国内外面板坝的建设发展迅速,但要兴建300 m级左右的高面板堆石坝,有些技术问题尚需研究。根据国内3座坝和巴西的坎泼斯诺沃斯及其他几座坝的运行性状,从渗流控制的角度提出了高面板堆石坝当前需要研究的面板与垫层的脱开问题、垫层料的优化设计问题以及砂砾石面板坝的排水设计问题,并提出了相应的研究途径。 The development of concrete face rockfill dam (CFRD) is rapid, but there are some technical problems to be still researched for building 300 m grade concrete face rockfill dam. On the basis of the behavior of three CFRDs in China and Campos Novos CFRD in Brazil, the authors put forward three questions to need to be solved now on seepage control : first, segregation between face slab and bedding layer; second, the optimization design of material of bedding layer; third, the drainage design problemes of the CFRD. Finally, the corresponding research ways are proposed.
出处 《长江科学院院报》 CSCD 北大核心 2009年第10期118-121,125,共5页 Journal of Changjiang River Scientific Research Institute
基金 国家自然科学基金委员会 二滩水电开发有限责任公司雅砻江水电开发联合研究基金项目(50639060) "十一五"国家科技支撑计划项目(2006BAC14B04)
关键词 高面板堆石坝 面板脱空 垫层设计 坝体排水 high CFRD void of face slab design of bedding layer drainage of dam
  • 相关文献

参考文献6

二级参考文献20

  • 1刘杰.沟后水库溃坝原因初步分析[J].人民黄河,1994,17(7):28-32. 被引量:16
  • 2朱建华 刘杰.天生桥面板坝碎石垫层料的渗透及渗透稳定性试验研究[M].北京:水利水电科学研究院,1989..
  • 3王连国 董槐三 等.天生桥水电站混凝土面板堆石坝堆石料及垫层料试验研究阶段报告[M].昆明:水电昆明勘测设计院科学研究所,1986..
  • 4太沙基 蒋彭年(译).工程实用土力学[M].北京:水利电力出版社,1960.37.
  • 5柏树田 水利水电科学研究院.西北口混凝土面板堆石坝筑坝材料特性的试验研究.水利水电科学研究院科学研究论文集(第32集)[M].北京:水利电力出版社,1991.19-29.
  • 6.SL228-98.混凝土面板堆石坝设计规范[S].,..
  • 7马贵昌.株树桥水库大坝原型观测分析报告[R].南京: 南京水利科学研究院,2000..
  • 8沈珠江 周正明.株树桥面板堆石坝应力应变分析[R].南京: 南京水利科学研究院,1991..
  • 9陈传淼 等.株树桥混凝土面板堆石坝应力应变分析[R].湘潭: 湘潭大学,1991..
  • 10[1]Paulo T Cruz,Manoel S Freitas.Cracks and flows in concrete face rockfill dams[A].Proceedings of International Symposium on Dam Engineering[C].Lisbon,Portugal,2007.

共引文献58

同被引文献95

引证文献8

二级引证文献84

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部