摘要
本文主要介绍了糯扎渡水电站心墙堆石坝不同的分区方案,并针对不同的分区方案进行了大量的坝坡稳定分析计算工作,为确定心墙堆石坝的分区方案提供了参考。
This article main introduces the different zoning schemes for the core wall rockfill dam of Nuozhadu Hydropower Station, and has carried out a lot of analysis and calculation toward the stability of dam slope according to different zoning schemes, to provide reference for confirming the zoning scheme of core wall rockfill dam.
关键词
糯扎渡
土石坝
分区
坝坡稳定
Nuozhadu
earth-rock dam
zoning
stability of dam slope