摘要
通过对黄河拉西瓦水电站导流封堵闸门的介绍,阐述了如何解决导流封堵闸门在导流前后出现的问题。为今后导流封堵闸门的设计和安装提出思考启示,并为高水头导流封堵闸门顺利下闸截流提供宝贵经验。
The paper describes the diversion tunnel plugging gate for Laxiwa hydropower project on the Yellow River, and presents how to deal with the problems of plugging gate occurred before and after river diversion. It provides references for the design and erection of diversion tunnel plugging gate in the future.
出处
《西北水电》
2009年第5期71-76,共6页
Northwest Hydropower
关键词
高水头
导流封堵闸门
设计安装
门槽保护钢框
止水形式
high head
diversion tunnel plugging gate
design and erection
gate slot protective steel frame
water seal pattern