1Kim, T., Lovell, D. J., and Paracha, J.(2001) "A New Methodology to Estimate Capacity for Freeway Work Zones." Proc., 2001 Transportation Research Board Annual Meeting, Washington D.C.
2Hojjat Adeil,Xiaomo Jiang."Neuro-Fuzzy Logic Model for Freeway Work Zone Capacity Estimation" J. Transp. Eng.,2003,129(5),484~493.
3Jiang, Y. "Traffic Characteristics and Estimation of Traffic Delays and User Costs at Indiana Freeway Work Zones," Project Final Report, Indiana Department ofTransportation.1999.
4Chien, S., and Schonfeld, P. "Optimal Work Zone Lengths for Two-lane Highways", J. Transp. Eng.,1999,125(1),21~29.
5Chien, S., and Schonfeld, P. "Optimal Work Zone Lengths for Four-lane Highways" J. Transp. Eng.,2001,127(2),124~131.
6Chien, S., and Schonfeld, P. "Optimizing Work Zones for Two-lane Highway Maintenance Projects", J. Transp. Eng.,2002,128(2),145~155.
7Federal Highway Administration.Manual on Uniform Traffic Control Devices for Streets and Highways (2003 Edition) [S].U.S.Department of Transportation,Washington D.C.,2003.