摘要
该文运用城市规划的理论和原则,从土地开发利用、道路交通规划、空间形态设计等方面介绍分析了武广铁路新长沙站区的规划设计要点。探讨了现代条件下高速铁路客运新区的规划设计方法。
Based on the urban planning theories and principles,this paper introduces and analyzes the gist of the planning design of the new area of Changsha Station in Wuguang Railroad from the aspects of the land exploitation and utilization,the planning of road traffic and the design of space form,and discusses the planning and design methods of the high speed railroad station in modern time.
出处
《城市道桥与防洪》
2009年第12期22-26,共5页
Urban Roads Bridges & Flood Control
关键词
武广铁路
新长沙站
城市规划
方法
Wuguang Railroad
new Changsha Station
urban planning
method