摘要 "工业化全预制装配式整体式剪力墙结构(NPC体系)技术"采用预制钢筋混凝土柱、墙及预制钢筋混凝土叠合梁、板等,通过预埋件、预留插孔灌浆、钢筋混凝土后浇部分等,将梁、板、柱及节点连成整体,形成整体结构体系。以南通市海门中南世纪城33号楼为试点工程,其核心技术为节点连接构造。 "Industrialized full-prefabricated assembly integral shear wall structure (NPC system) technology" adopts precast reinforced concrete column, wall, composite beam and plate which are connected into an integral structure system with nodes through pre-embedded fitting, reserved plug hole grouting and post casting of reinforced concrete. The No.33 building of Haimen Zhongnan Century City of Nantong City is taken as a pilot project and its core technique is node-connected structure.
作者 陈耀钢
出处 《建筑技术》 北大核心 2010年第2期153-156,共4页 Architecture Technology
基金 住房和城乡建设部2009年科学技术项目计划(JGJH2008-09)
关键词 工业化 全预制 装配 节点构造 industrialization fully prefabricated assembly node structure
  • 相关文献

参考文献1

  • 1建筑施工手册[M].第4版.北京:中国建筑工业出版社,2003.

同被引文献140

引证文献21

二级引证文献189

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部