期刊文献+

基于平衡记分卡的产品规划中顾客需求综合优先度的确定

Determination of Integrated Priority Ratings of Customer Requirements in Product Planning Based on Balanced Scorecard
下载PDF
导出
摘要 研究产品规划质量屋中顾客需求综合优先度的确定问题。根据被调查顾客的顾客需求竞争性评价和互补偏好矩阵,建立相应于每个顾客的顾客需求优先度确定的优化模型,通过拉格朗日函数的构造求解这些优化模型,进而利用群决策方法确定基于顾客视角的顾客需求基本优先度;通过平衡记分卡和比例标度法的集成,确定基于非顾客视角的顾客需求优先度;基于顾客视角的顾客需求基本优先度和基于非顾客视角的顾客需求优先度的合成,确定顾客需求的综合优先度。以某企业的实例说明该方法的应用。 Determination of the integrated priority ratings of customer requirements in a product planning house of quality was investigated for new product development.Firstly,according to the competitive evaluations and complementary preference matrixes of customer requirements for the selected customers,a model determining the priority ratings of customer requirements corresponding to every one of the selected customers was built and resolved by using Lagrange function,and then the fundamental priority ratings of customer requirements from the angle of customers' view were determined by using group decision-making approach.Secondly,based on the integration of balanced scorecard and analytical hierarchy process,the priority ratings of customer requirements from the angles of no-customer views were determined.Lastly,based on a combination of the priority ratings of customer requirements from the angle of customers' view and the priority ratings of customer requirements from the angles of no-customer views,the integrated priority ratings of customer requirements were determined.A case study was provided to illustrate the applications of the proposed method.
出处 《中国机械工程》 EI CAS CSCD 北大核心 2010年第12期1430-1434,1440,共6页 China Mechanical Engineering
基金 国家自然科学基金资助项目(70721001 70871020 70971017)
关键词 产品规划质量屋 顾客需求 优先度 平衡记分卡 product planning house of quality customer requirement priority rating balanced scorecard(BSC)
  • 引文网络
  • 相关文献

参考文献19

  • 1Akao Y, Mazur G H. The Leading Edge in QFD: Past, Present, and Future[J]. International Journal of Quality & Reliability Management, 2003,20 ( 1 ) :20-35.
  • 2王美清,唐晓青.一种面向产品规划过程的组合质量屋[J].北京航空航天大学学报,2004,30(7):652-656. 被引量:36
  • 3徐宣国,李向阳,李辉,王颜新.基于资源观的虚拟企业组建决策支持系统的构架[J].中国机械工程,2007,18(11):1312-1316. 被引量:4
  • 4车阿大,杨明顺.质量功能配置理论及应用[M].北京:电子工业出版社,2008.
  • 5Zheng L Y,Chin K S. QFD Based Optimal Process Quality Planning [J]. International Journal of Advanced Manufacturing Technology, 2005, 26(7/8):831-841.
  • 6Chan L K, Wu M L. A Systematic Approach to Quality Function Deployment with a Full Illustrative Example [J]. Omega,2005,33(1): 119-139.
  • 7Wasserman G S. On How to Prioritize Design Requirements during the QFD Planning Process [J]. IIE Transactions, 1993,25 (3): 59-65.
  • 8Park T, Kim K J. Determination of an Optimal Set of Design Requirements Using House of Quality [J]. Journal of Operations Management, 1998, 16 (5) :569-581.
  • 9Han C H,Kim J K,Choi S H. Prioritizing Engineering Characteristics in Quality Function Deployment with Incomplete Information: a Linear Partial Ordering Approach [J]. International Journal of Production Economics, 2004,91 (3) : 235-249.
  • 10Khoo L P, Ho N C. Framework of a Fuzzy Quality Function Deployment System[J]. International Journal of Production Research, 1996,34 (2):299-311.

二级参考文献32

  • 1王建维,张建明,魏小鹏,张德珍.产品方案的模糊协同评价方法[J].农业机械学报,2005,36(3):106-110. 被引量:8
  • 2朱龙英,朱如鹏,刘正埙.基于信息公理的产品设计方案评价方法[J].南京航空航天大学学报,2005,37(3):386-390. 被引量:18
  • 3和延立,何卫平,杨海成,莫蓉,张英,房亚东.基于Agent和工作流的跨企业协同制造支持系统[J].中国机械工程,2005,16(22):2010-2015. 被引量:8
  • 4[5]Lee J W, Kim S H. Using analytic network process and goal programming for interdependent information system project selection [J]. Computer & Operation Research, 2000,27:367~ 382
  • 5[6]Ertugrul Karsak E, Sozer S, Emre Alptekin S. Product planning in quality function development using a combined analytic network process and goal programming approach [J]. Computer & Industrial Engineering, 2002,44:171 ~ 190
  • 6Sullivan L P. Quality function[J]. Quality Progress, 1986, 19(6) : 39--50.
  • 7Guinta L R, Pfizler N C. The QFD Book: The Team Approach to Solving Problems and Satisfying Customers through Quality Function Deployment[M]. New York: Amacom, 1993.
  • 8Lai K Chan, Ming L. Wu. Prioritizing the technical measures in quality function deployment[J]. Quality Engineering. 1998, 10(3) : 467--469.
  • 9Wasserman G. On how to prioritize design requirements during QFD process[J], liE Transactions, 1993, 25(3) : 59--65.
  • 10Wang J. Fuzzy outranking approach to priofitize design requirements in quality function deployment[ J]. International Journal of Production Research, 1999, 37(4) : 899--916.

共引文献124

;
使用帮助 返回顶部