摘要
上海雪野路电力隧道A号电缆工井为圆形结构,兼作顶管井,其连接通风道基坑为矩形,基坑整体平面形状不规则,开挖深度不一致且周边建筑物密集,基坑施工过程较复杂。针对上述难点,采用SMW工法基坑围护方法,并合理确定了基坑施工顺序。介绍了该基坑围护结构的设计方法及关键施工工艺。基坑变形监测结果证明该施工过程安全可控。
The No.A cable working well of Xueye Road electrical tunnel in Shanghai is a circular structure.The working well is also designed as pipe-jacking well.The foundation excavation of ventilation tunnel is designed as a rectangular structure.So the difficulties for design and construction of the foundation support can be summed up as: irregular plan,inconsistent excavation depth,dense surrounding buildings and complex construction process.Based on the difficulties,SMW construction method is adopted for supporting the foundation excavation.Moreover,reasonable construction process is decided.The author introduces design method and key construction technology of the support structure for foundation excavation.Monitoring results show that the construction process is controlled in allowable range.
出处
《施工技术》
CAS
北大核心
2010年第11期54-56,共3页
Construction Technology
关键词
电力隧道
工井
基坑围护
SMW工法
electrical tunnel
working well
foundation excavation support
SMW construction method