摘要 上海雪野路电力隧道A号电缆工井为圆形结构,兼作顶管井,其连接通风道基坑为矩形,基坑整体平面形状不规则,开挖深度不一致且周边建筑物密集,基坑施工过程较复杂。针对上述难点,采用SMW工法基坑围护方法,并合理确定了基坑施工顺序。介绍了该基坑围护结构的设计方法及关键施工工艺。基坑变形监测结果证明该施工过程安全可控。 The No.A cable working well of Xueye Road electrical tunnel in Shanghai is a circular structure.The working well is also designed as pipe-jacking well.The foundation excavation of ventilation tunnel is designed as a rectangular structure.So the difficulties for design and construction of the foundation support can be summed up as: irregular plan,inconsistent excavation depth,dense surrounding buildings and complex construction process.Based on the difficulties,SMW construction method is adopted for supporting the foundation excavation.Moreover,reasonable construction process is decided.The author introduces design method and key construction technology of the support structure for foundation excavation.Monitoring results show that the construction process is controlled in allowable range.
作者 卢辰
出处 《施工技术》 CAS 北大核心 2010年第11期54-56,共3页 Construction Technology
关键词 电力隧道 工井 基坑围护 SMW工法 electrical tunnel working well foundation excavation support SMW construction method
  • 相关文献

参考文献4

二级参考文献5

共引文献54

同被引文献13

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部